The construction of the Metropolitan District Railway c.1866 27.120/1bb along with a map highlighting
Pay in 4 interest-free payments of $6.25 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 20 - Aug 25
Live Spec
The construction of the Metropolitan District Railway c.1866 27.120/1bb along with a map highlightingThe roof of the completed Paddington (Pread Street) Station, which opened in 1868. From a series of 64 photographs taken in the late 1860s by Henry Flather to document the construction of the railway from Paddington to Blackfriars via Kensington, Westminster and the new Victoria Embankment. Construction was by the 'cut and cover' method used to build the first underground railways before the development of the tunneling shield by James Henry Greathead
Store: www.drbramiyohan.com · Domain: www.drbramiyohan.com

























