Toolroom Length Colour:N/A The BOS process
Pay in 4 interest-free payments of $25.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 26 - Aug 31
Live Spec
Toolroom Length Colour:N/A The BOS processRows of neglected workbenches recede into the distance, scattered implements coated in years of industrial dust. This was the 1975 toolroom at the ATL Building, Meadowbank, built across Nancarrow Avenue from the main factory as Asian manufacturing competition intensified. Precision engineering for racecourse totalisator systems once ran the length of this room. Part of the ATL Building series.
Store: www.drbramiyohan.com · Domain: www.drbramiyohan.com

























