Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Slab Cutting fire purpose-built in 1957 to serve

SKU: 61655372562

4.8
USD100.00 USD143.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 27 - Sep 1

Live Spec

Slab Cutting fire purpose-built in 1957 to serveA steel slab taken mid cut, molten sparks cascading in every direction, the scale of the operation filling the frame. This is the basic oxygen and continuous casting era of Port Kembla Steelworks, where slabs produced from 200 250 tonne BOS vessels move through the plant as flat steel destined for domestic and export markets. Australia's largest crude steel production plant, photographed in 2016. Part of the BlueScope Port Kembla series.

Store: www.drbramiyohan.com · Domain: www.drbramiyohan.com

Description

purpose-built in 1957 to serve the Balmain Tigers community

concrete block walls covered floor to ceiling in graffiti tags

Turbine Hall Basement at Rozelle

Photographed 2016

Slab Cutting fire purpose-built in 1957 to serveA steel slab taken mid cut, molten sparks cascading in every direction, the scale of the operation filling the frame. This is the basic oxygen and continuous casting era of Port Kembla Steelworks, where slabs produced from 200 250 tonne BOS vessels move through the plant as flat steel destined for domestic and export markets. Australia's largest crude steel production plant, photographed in 2016. Part of the BlueScope Port Kembla series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products