Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

First Floor Size:M dust catching in shafts of

SKU: 41641698096

4.7
EUR100.00 EUR126.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 27 - Sep 1

Live Spec

First Floor Size:M dust catching in shafts ofThe first floor of Peters Creameries Pty Ltd's Chatham factory, concrete surfaces stripped back by decades of weathering and peeling paint scattered across the floor. Built in 1939 by contractor D. Gallagher for approximately 60,000, the plant was a steam driven dairy operation that once ran capacity for 70 to 80 workers across three shifts. Part of the Peters' Ice Cream Factory series.

Store: www.drbramiyohan.com · Domain: www.drbramiyohan.com

Description

dust catching in shafts of light above the worn surface

dust settled on the carpet and debris across the floor

the last surviving remnant of the brick-producing belt that once ran from Hawthorn to Mitcham

supplying blue metal for road construction across northern Sydney

First Floor Size:M dust catching in shafts ofThe first floor of Peters Creameries Pty Ltd's Chatham factory, concrete surfaces stripped back by decades of weathering and peeling paint scattered across the floor. Built in 1939 by contractor D. Gallagher for approximately 60,000, the plant was a steam driven dairy operation that once ran capacity for 70 to 80 workers across three shifts. Part of the Peters' Ice Cream Factory series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products