Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

BOS Scrap Loading dark The 5-cylinder 2-stroke Polar diesel

SKU: 1743704853

4.5
PLN100.00 PLN138.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 25 - Aug 30

Live Spec

BOS Scrap Loading dark The 5-cylinder 2-stroke Polar dieselA skip loaded with steel scrap sits beneath the crane gantries of the Basic Oxygen Steelmaking plant at Port Kembla Steelworks. The BOS process, introduced in 1972 using 200 250 tonne vessels, replaced the open hearth furnaces that had run since 1931. Scrap is one of the raw material inputs charged into those vessels before the oxygen lance begins its work. Part of the BlueScope Port Kembla series.

Store: www.drbramiyohan.com · Domain: www.drbramiyohan.com

Description

The 5-cylinder 2-stroke Polar diesel fills the right of the engine room

the paintwork long since given up

The brickworks operated under several owners from 1884

Turbine Hall Work Bench at Rozelle

BOS Scrap Loading dark The 5-cylinder 2-stroke Polar dieselA skip loaded with steel scrap sits beneath the crane gantries of the Basic Oxygen Steelmaking plant at Port Kembla Steelworks. The BOS process, introduced in 1972 using 200 250 tonne vessels, replaced the open hearth furnaces that had run since 1931. Scrap is one of the raw material inputs charged into those vessels before the oxygen lance begins its work. Part of the BlueScope Port Kembla series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products